Revamping of the waste to energy plant of Trieste

Revamping of the waste to energy plant of Trieste

Country and reference standards

Italy

Project

Revamping of the line 2 of the waste to energy plant of Trieste.

Supply description

Development of the construction project with the usage of BIM technology, edit of the existing tools to restore, supply and installation of new tools, develop of the DCS software system (ABB Freelance/S800).

Commissioning, training, start, acceptance test of the system supply.

Supply and put into work the new Power Center and secondary distribution system of the plant.

Technology used

DCS software system ABB Freelance/S800

Distinctive elements

The new Power Center is complete with all the intelligent protection devices, capable of transmitting the energy values ​​absorbed by the various sections of the system via the network, allowing the operator to optimize and better manage the consumption of the entire system by optimizing energy and economic savings.

Customers benefits

The revamping activities of the line 2 of the waste to energy plant, will allow an increase of the performance of the plant to 700 tons of waste disposal per day, as required from the customer.