Sogliano al Rubicone (FC), Italy (IEC)
Realization of the electro-instrumental works necessary for the landfill called “G4” at the Ginestreto di Sogliano al Rubicone landfill in order to safely convey and store the leachate to the existing purifier and feed the Biogas produced to the existing cogenerator.
Executive design, control software, supply of MV / LV traf, MV switchboards, power Center power and LV distribution switchgear, automation and maechanical systems for power supply, command and control whole system.
Schneider
Integration of all the technologies adopted on a system developed on approximately 2K square meters, use of 3 HMI 3 Plc and distributed peripherals. The I / O points including analogous checks are over 350. Interfacing through fiber optic connection with the customer’s central system is also envisaged.
Possibility to control (also totally remotely) and in real time all the system statuses, allowing a reduction in response times in the event of anomalies, minimizing the use of personnel, reducing downtime in machines and plants, with an integrated process management.